BUILDING E & PARKING GARAGE

 

The company’s partnership with Dunes of Panama Building E & Parking Garage in Panama City Beach, Florida, represents a $1.5 million comprehensive restoration project completed in 2025 over the course of 10 months. This multi-phase rehabilitation enhanced the long-term durability, safety, and appearance of both the residential tower and its adjacent parking structure. The project demonstrates the company’s ability to execute complex structural restoration and waterproofing work in an occupied beachfront condominium while maintaining exceptional quality, schedule, and resident accessibility.

 

Throughout the project, the construction team completed an extensive scope of structural and protective restoration work designed to extend the service life of the property. Building improvements included crack and concrete spall repairs; replacement of stairwell doors; restoration of stairwell handrails through grinding, welding, and localized repairs as required; and the application of a durable protective coating. The team also prepared, repaired, and installed a waterproof pedestrian traffic coating across all common walkways, providing long-term protection against moisture intrusion and the harsh coastal environment.

 

The adjacent parking garage underwent significant rehabilitation, including structural concrete repairs and the installation of a Transpo T-70 traffic coating system on the top parking deck. Similar concrete restoration methods were utilized throughout the garage to repair deteriorated areas before applying a high-performance protective system designed to resist water infiltration, chloride penetration, and daily vehicular traffic.

 

Executing multiple restoration activities within an occupied condominium community required careful planning, phased construction, and close coordination with property management and residents. The team maintained safe access throughout the project while minimizing disruptions to pedestrian circulation and parking operations. By combining experienced field supervision with disciplined quality control, each phase was completed efficiently while meeting the project’s demanding structural and waterproofing performance requirements.

 

The successful completion of the Dunes of Panama Building E & Parking Garage restoration strengthened the property’s structural integrity, improved the appearance of key common areas, and provided long-term protection against the challenging Gulf Coast environment. The project further reinforces the company’s expertise in delivering complex concrete restoration, waterproofing, and parking structure rehabilitation projects for occupied coastal condominium communities throughout Florida.

Category
Northwest